Hi
we are using CTM and the scenarion and requirements are like this
Scenario:
The requirement at location 1001 is for item 142-652244-00, whereas stock for the substitute part 142-652244-01 is available at location 1004. Substitution from
142-652244-01 to 142-652244-00 takes place at location 1004 and STR for 142-652244-00 is created to transfer stock from 1004 to 11001. is created to transfer
stock from 1004 to 11001.
Requirement:
When such STR are published from APO to R/3, these STR should transfer substituted part number 142-652244-01 along with it.
Thanks in advance