Assets in Projects

Hi,

Given below is the Scenario and Client Requirement:

The client is having equipments (EX. Vaccume Cleaner, Water Jet Machine etc)which are defined in the system as assets under assets class.These assets are used in Various projects.

The client wants to know which assets are available in a particular project and the cost incurred to maintain the same should be booked as expenditure to the Project.

Pl help me to meet the above requirement.

Regards,

Prasad

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Nov 19, 2007 at 03:53 PM

    i thought over this and have following to suggest ( not sure if this works)

    create materials for all the assets and add them to your projects. now use the project stock functionality to keep track of the materials quantity( i.e your assets )

    the report MBBS would give you the project stock for these materials ( assets ) in the projects.

    Capture all the costs to the activity you have attached the materials and then settle these to relevant assests.

    let me know if this works.

    regards

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 20, 2007 at 06:40 AM

    Hello,

    One of the process to map this scenario could be as following

    1. Create the equipment with reference to the asset. (As the vac.cleaner etc. are nothing but the equipment) Specify asset number in the equipment.

    2.Assign this equipment to the WBS in project.(in WBS Assignment tab.)

    3.For booking the maintaince cost of the asset (equipment) you can create a maintenance order with reference to WBS and settle the expenses incurred periodically to project. Thus the expenditure can be seen on the project.

    Hope this should solve your problem.

    Thanks

    Hemant

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi hemant,

      There is more than one asset (Equipment) in a particular project.

      The client wants to know which assets are available in a particular project apart from the maintenance cost.

      Regards,

      Prasad

  • Posted on Dec 05, 2007 at 01:50 PM

    Hello Raghavendra,

    could you please check if you can use the transcation IH08 for this purpose. Here you can search for equipments and enter the WBS element.

    Hope that this helps you.

    Regards,

    Isabelle

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.