on 11-13-2007 7:05 AM
Hi Friends,
I have done the Planning run ( Long term planning ) using tcode MS01. it has planned for the finished goods but the dependent requirements are not planned.
What can be the possible reasons???
Naren
Dear Narendra
Check u'r long term planning Procedure
1.) Create Planned Independent Requirememts (T.C MD61)
2.) Create Planning Scenario ( T.C MS31)
3.) Create Planning File Entries (T.C MS20)
Then Run Long Term Planning ( T.C MS01).Here Dependent requirements will not be created.Only Simulated requirements (SimReq) will be created.
You can view your stock requirements list through MS04
Reward points if usefull
Regards
Palaniappan
Message was edited by:
Palaniappan Sundaram
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
pl. check material master for dependent materials .
Straetgy group in material master should be blank .
If it is not blank you have to make some more saettings.
Regards
YMREDDY
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
101 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.