Hii.

I have a requirement for transfer the materail from one plant to another withen the same plant using the sd route.

i need to incorporate the cost of transportation in the materail cost, do i need to configure mm pricing procedure and assign it to document UB or is it taken care by SD.

if it is added to materail cost than i will have two different pricce for the same material..

kinldy clerify..

Regards

Sarfraz