PP members:
I have been looking into Basic Scheduling & Lead Time Scheduling
Basic Scheduling is basically used to calcuate Basic Start & Finish dates for the Planned order ( without considering capacity reqts) and it can be maintained in MRP 2 view ( Inhouse Prod Time, GR processing Time & SMK)
While, Lead Time Scheduling is used to calculate Production Start & Finish Dates ( i.e. Scheduled Start & Finish Dates) for the production orders ( considering capacity requirements). utilizing the <b>data</b> <b>from routings</b>
Now, what <b>data of the routing</b> is it exactly being used to <b>calculate Lead Time Scheduling</b>
Also, I was looking for <b>Lead Time Scheduling Field</b> is Routings and W/c's but I am not able to find the respective
Any inputs into the above
Thanks
Suren R