MD01 Run

I have a situation, I have ran MD01 after one of our plant has changed its factory calender to specify one whole week as holiday.

I have checked all planned orders and none of them are firmed. Now when you run MRP for plant (MD01) with planning mode 3, The MRP should reschedule the planned order for that week, which was changed to holiday recently.

FYI.. the week in question is within the planning horizon.

After Planning run (both MD01 and MDBT) I am still seeing so many materials that are missed during planning.

When I run MD02 for those materials which are missed, I can see them getting planned.

Does anyone have any clue on what is happening?

Please let me know.

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Nov 09, 2007 at 04:53 PM

    Dear,

    Run MD01 using processing key = NEUPL.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Business does not allow me to Run MRP with NEUPL. Other than considering NEUPL, is there anything else which can try out.

      I thought the same earlier and the business is totally opposite to use NEUPL. So I have dropped that idea.

      Any other suggestions, please let me know.

  • Posted on Nov 10, 2007 at 03:10 AM

    Kole,

    MRP selects materials for planning based on the Planning file entry for the materials...in your case some of the material have undergone MRP relevant change after your last MRP run, so system would have created a planning file entry for the same. This is the reason only some materials got planned.

    As suggested by Rajesha... Please run MRP(MD01) with processing key NEUPL-Regenerative Planning....so that all the materials in the plant would be considered for MRP Run.

    Regards,

    Prasobh

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 14, 2007 at 09:08 PM

    please come back

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 18, 2007 at 08:19 PM

    please come back

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.