Hi All,

After doing a system copy from the Production system to some test system, all the jobs that are supposed to be triggered in the production server will also trigger in the test system which is not good.

For example, If we have a payroll running every month. After i do a system copy the same payroll will also be triggered in the test server which is un acceptable.

How do we go about it and what are all the steps that we need to follow after a system copy?