Stock at subcontractor

Dear Friends,

I have case like I have certain stock at subcontractor and now his code is changed. So how can transfer stock at his old vendor code to new vendor code.

Please guide.Thanks in advance.

Regards,

Amar

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Nov 06, 2007 at 08:51 AM

    Hi

    U need to bring back stock Reverse by MB1B 542 movement cancell PO

    and then raise new PO with new vendor code and pass MB1B with 541 Movement to post stock to new vendor code

    Vishal...

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 06, 2007 at 10:03 AM

    Hi,

    It is not possible to transfer subcontracting stock from one vendor to another. This movement type does not exist.

    You have to get the material back to your storage location, and send it again to the other vendor.

    Regards,

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 02, 2007 at 05:39 AM

    thanks

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.