on 11-06-2007 8:46 AM
Dear Friends,
I have case like I have certain stock at subcontractor and now his code is changed. So how can transfer stock at his old vendor code to new vendor code.
Please guide.Thanks in advance.
Regards,
Amar
Hi
U need to bring back stock Reverse by MB1B 542 movement cancell PO
and then raise new PO with new vendor code and pass MB1B with 541 Movement to post stock to new vendor code
Vishal...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
It is not possible to transfer subcontracting stock from one vendor to another. This movement type does not exist.
You have to get the material back to your storage location, and send it again to the other vendor.
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.