Skip to Content
avatar image
Former Member

Integration revenues and earnings in project system

Hi,

can anybody send me documentation about the integration between SD and PS?

thanks

my email is davidip1975@gmail.com

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    avatar image
    Former Member
    Nov 05, 2007 at 12:09 PM

    Hi David,

    Project System(PS) works for any project e.g construction, operation or any large projects where project management tools are required. it integrates all modules may be like MM for vendor process or for RFQ etc or say may be SD for Resource related quotation with the help of DIP profile or Milestone process etc. IT is largely used in construction projects. IT helps in controlling the whole of project from one single screen and it works with 3 elements WBS element ( work break down structure), Network and Activity.

    Please go throgh this Please check this links perhaps they may help.

    http://help.sap.com/bp_imcv1500/IMC_US/HTML/preconfigured_scenarios.htm

    ETO:

    http://help.sap.com/bp_imcv1500/IMC_DE/HTML/E83_EN_DE.htm

    http://help.sap.com/bp_bblibrary/500/HTML/E46_EN_DE.htm

    MTO:

    http://help.sap.com/bp_bblibrary/500/HTML/V66_BB_EN_US.htm

    http://help.sap.com/bp_imcv1500/IMC_DE/HTML/E70_MTOQuotProc_EN_DE.htm

    PS - SD integration are on

    1.Billing pan, at each WBS element, network and Activity level.

    2. DIP profile which is assigend to item category. DIP for resource related quotation works only with ECP ( easy cost planning).

    3.sales pricing - generally, there r 2 types of sales pricing in PS . lumpsum contract and unit rate contract.

    4. BOS - bill of Services. which has to be activated. It is industry specific solution. If BOS is activated you also have integration for vendor RFQ and Analysis.

    5. resource related Billing

    http://help.sap.com/saphelp_46c/helpdata/en/aa/96853478616434e10000009b38f83b/frameset.htm

    Following is the SD & PS integration scenarios where milestone billing & Periodic billing plays the implortant role for these integration:

    Milestone billing is typically used for billing projects, such as plant engineering and

    construction projects. Such projects often include a series of milestones that mark the

    completion of different stages of the work. In the SAP R/3 System, milestones are defined

    in a network along with planned and actual dates for the completion of work. The milestones

    are also assigned to the billing dates in the billing plan. The connection between the project and the sales document item is made in the individual

    schedule lines of the item. Each schedule item can be assigned to a network in a project.

    PS-SD Integration as below :

    A)Billing plan, at each WBS element, network and Activity level.

    B)DIP profile which is assigend to item category. DIP for resource related quotation works only with ECP ( easy cost planning).

    C)sales pricing - generally, there r 2 types of sales pricing in PS . lumpsum contract and unit rate contract.

    D)BOS - bill of Services. which has to be activated. It is industry specific solution. If BOS is activated you also have integration for vendor RFQ and Analysis.

    Reward points if find useful..

    Regards..

    Praveen Kumar.D

    Add comment
    10|10000 characters needed characters exceeded