cProjects Planned costs display

Can you display planned costs in cprojects after doing financial integration(Calculated on Role/Task revenue rates) against each phase or task without going into each individual task separately.

Which all options of displaying planned costs are available and how are these configures ?

Is this carried out via the planning mechanism chosen Role-based resource planning or Task Based.If yes, Where do you specify which of the 2 options to choose ?whether you want to choose role based or task based planning.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Nov 04, 2007 at 05:27 PM

    Hai Pooja

    Costing is carried out in cProjects based on the project roles r tasks.

    Reg tasks based cost planning u can assign the required capacity to the individual tasks during the planning of the project structure.This required capacity is multiplied by the cost/revenue rates ti determine the planned costs and planned revenues.

    Task is done by a role - means for example Project Manager specifies which positions are to be filled up - these positions are called in cProjects as Roles(resources for the project). Thye are assigned to the tasks in which the positions are involved.

    Check the configuration in - SPRO - cProjects - Connection to external system - Accounting Integration - Integration using Single Object Controlling in SAP R/3 CO - Make General settings

    ENJOY mySAP PLM

    Regards

    PP