Skip to Content

How to copy objects from Engineering Record to Change Master

Sep 27, 2017 at 02:54 PM


avatar image


I have created an Engineering Record and added some materials to the ER and assigned the Change number to the object. But the materials are not copied to the Change number when look in to the Change number in CC03. So I am not able to make changes to material. What could be wrong here?

Any input is appreciated,



10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers