cancel
Showing results for 
Search instead for 
Did you mean: 

Duplication of PR

Former Member
0 Kudos

Noticed a strange thing. Sales order having one line item with 2 qty has generated 2 PRs for the same item. Both the PRs got converted to POs.

How do I find why two PRs are generated for a single order line with qty 2.

Thanks,

Sushil

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

pl check the schedule lines generated for the sales order line.

if there is 2 schedule lines, then obviously 2 PRs would be generated.