Hi All,

I have copied a project on which extrenal activity and non stock material was assigned.User status also being used at WBS and activity level, so when I save my project and put external activity to immediate for PR creation, PR created but when I run CJ40, no plan cost there as PR is already created.

In other case when I created new project instead of copying project and follow same step as mention above, than I got plan cost at CJ40.

I have check my USER STATUS transaction control which is working fine in case of new project but not working in case of copying project.

Other case is if I copy project without USER STATUS than, I got cost plan from CJ40.

For reference, previously I posted on scn but didn't get resolution so please find below link which I posted before scn upgradation.

https://archive.sap.com/discussions/thread/3960878

Regards,

Faizan Khalil

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.