Hi,
there is one cost elements posted in an internal order. This order is settled 100% in a cost center. The cost element sould be settled 80% as a variable cost and 20% as a fixed cost in one cost center. How can I include these percentages in the settlement rule or in the structure?
Please help me in this matter.
Regards