Skip to Content
0
Former Member
Oct 31, 2007 at 02:21 PM

ORDER SETTLEMENT WITH SPECIFIC COST ELEMENT PERCENTAGES

39 Views

Hi,

there is one cost elements posted in an internal order. This order is settled 100% in a cost center. The cost element sould be settled 80% as a variable cost and 20% as a fixed cost in one cost center. How can I include these percentages in the settlement rule or in the structure?

Please help me in this matter.

Regards