Skip to Content
avatar image
Former Member

How many levels can we drill down charts in Lumira 2.0 Discovery

Hi.

I created custom hierarchy at 4 level.

In the crosstab, I was able to drill down at 4 level.

However, in the charts, I can drill down at ONLY 3 LEVEL.

By the way, in Lumra 1.3, more than 4 drilldown works.

Is it impossible to drill down at more than 4 level in the Lumira 2.0 discovery?

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

0 Answers