Overhead allocation through template for material cost estimate with quantity structure

Former Member
0 Kudos

Hi all,

due to a new customer requirement for allocation of production overhead in material cost estimate with quantity structure (CK11N/CK40N) we would like to apply the template technique for it. The corresponding environment is probably the "001" (cost estimate / production order). What's actually our biggest challenge is to access the production cost of the processed material within CK11N/CK40N. Is this possible by standard functions via the template technique in environment '001'. None of the accessable tables in the template environment contain these production costs.

Nevertheless we can easily see the production costs in the cost element view or itemization (quantity and cost based on the calculation lot size). That’s why I would really appreciate your expertise how to get a solution for this requirement.

Thanks a lot, Bernd

Accepted Solutions (0)

Answers (0)