Skip to Content
0

Batch Number carry forward

Sep 27, 2017 at 06:11 AM

79

avatar image

Dear Experts,

My Client produces SFG and FG. SFG batch number is assigned by the system.
My client wants the same SFG batch number to be carry forward by the system as the FG batch number - ae0005 (SFG batch no.) -- ae0005 (FG batch no.).
As per my understanding this is not possible in standard system. What can be done to achieve this? Kindly Provide the Details, step by step guide is required.
It's pharmaceutical industry and its internal batch number assignment.
Also if there's a way to carry forward manufacturing date from SFG to FG than that would be great. Manufacturing date is not SLED date.


BR,

Shankar

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

1 Answer

K V Kumar Sep 28, 2017 at 09:17 AM
0

Hi,

You need to use batch derivation functionality. Kindly check the below links for the same.

https://blogs.sap.com/2013/02/18/batch-derivation-overview-with-example/

https://blogs.sap.com/2014/01/23/batch-derivation-in-production/

for assigning the component batch number to production order /process order header material batch number, check the below links.

https://archive.sap.com/discussions/thread/3318218

https://archive.sap.com/discussions/thread/3573826

Thanks

Kumar

Share
10 |10000 characters needed characters left characters exceeded