Skip to Content
0
Former Member
Oct 28, 2007 at 02:00 AM

How to configure, push and test Idoc from XI to R/3

22 Views

Assuming mapping between imported Idoc and some file structure is fine ,I have to configure XI and R/3 for pushing Idocs from Xi to r/3. I have to make sure they talk.

-I have done this long time ago for pushing Idocs from R/3 to XI but I wonder if it is same procedure or it is different ?

-Can someone tell me - how to configure both for this purpose partner profiles , logical systems etc ?

-And also after configurations , how I can check if Idocs is received from Xi and the entire process is successful?

-does it make difference the type of Idocs during the configurations?

-Are the test for success same for all type Idocs?

Thanks all !

Jon