Skip to Content
0
Sep 21, 2017 at 01:07 PM

Automatically update maintenance plan when changing serial number in EQ

79 Views

When we change a serial numer in an EQ this change is not reflected in the maintenance plans that is created for the EQ. The notifications that is generated by the MP is pointing towards the old serial number.

Is there a report that we can run that fix this issue as a batch job? Today we have to go into change mode in the MP and then the serial number is updated. I feel that this is a really unessesary step.