Alternative BOM

Hi friends,

We have scenario like this

suppose header mat. X. and comp are A, B, C, D. Now A has alternative items E, F, G.

if we use any of them we can create X. the component e, f, g, a, we are using depend upon the stock of items. now my question is. wt is the best cofg for this. i can create alte bom but can i create it for more than one item.I also need some detail clarification on alt bom

regards,

Solomon

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Posted on Oct 23, 2007 at 07:54 AM

    Hi,

    You can create alternate BOM using CS01 with the same usage & in the item data can add E,F,G.

    You can create two production version using C223, select the BOM based on prod version.

    BOM selection setting is in mrp 4 view of material master.

    You can select based on lot size,date or production version.

    Regards

    Senthilkumar

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 23, 2007 at 08:11 AM

    Hi,

    Since you are selecting BOM based stock of items, u can create two alternative BOM for material X. In 1st alternative bom assign all of your items(A,B,C,D), For 2nd alternative assign B,C,D except A.

    Create two production versions for your header material and assign two alternative BOM

    During planning system will select first production version by default. if u dont want include 1st alt BOM (if A has No stock) then "lock" the first prodction version by manually.

    Before that u have to assign BOM seelction = 2&3 (by prod.ver) in Mrp view of your header material

    regards

    pradeep

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 23, 2007 at 08:14 AM

    Hi,

    You can define the alternative item for A as e,f,g and based on the strategy , priority, and usage probability we can go alternate selection.

    define the alternative item group in BOM of your fert and in the item details of A define the alternate group .

    In BOM alternative items are assigned to alternative item group on the general

    data.

    In the production order in the general data tab page.

    We can define the alternative items based on priority , strategy and usage probability.

    Priority:

    This defines the priority of the item within the alternative item group.

    This determines the priority of planned withdrawls of items.

    EX Two items are assigned to alternative item group

    item A Priority 1

    item B Priority 2

    The system reads the item A first.

    Strategy:

    use the strategy to determine how the planned withdrawl is controlled

    within the alternative item group.

    The strategy should be same for all alternative items within a alternative

    item group.

    If the value 2( 100% check) is defined for the strategy the first material in

    the defined priority sequence for which sufficient quantities are available

    are reserved.

    If value 1 is used( manual maintainence/ usage probability) depending upon the

    availability you can manually with draw components.

    Usage Probability:

    MRP Plans these alternative material components according to probability

    of use.Material requirements for BOM Components are planned according

    to usage probability.

    The planned withdrawls for the production order are based on the

    reservation lists.These lists are based on the priority and strategy.

    Regards,

    nandha

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 23, 2007 at 08:47 AM

    Hi Solomon

    Yes you can create More then one item alt BOM

    You can try Alt Material GRP

    Cheers

    Bala

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.