can anybody give me direction to get report of modelwise first date of production.

Means i shall give the list of material and required output is date of first material production

regards,

Bharat

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Bharat,

letme give some inputs,

have u created any production order for your list of materials.

suppose if two materials have same production dates, inthat case what is your requirement.

could u explain more in detail

regards

pradeep

Former Member
0 Kudos

Dear Pradeep,

we are working in repetative mfg.

if A is model and production dates are as follows

A

Date Qty

10-Oct 10

11-Oct 20

12-Oct 30

then required output should be 10-Oct

regards,

Bharat

Former Member
0 Kudos

Hi,

i hope you are using Modelmix in production line in REM. Inthat case for every material u should have planned order AM i correct. If so u can use Table PLAF .

if u give your material list here, u will get order start date and finished date (see the fields PSTTR,PEDTR). u can sort ur planned order based on date.

I hope this will solve ur problem

regards

pradeep

Former Member
0 Kudos

I am having datewise production. after converting it to excel i am able to find the answer but i want the answer without excel interference.

rgd,

Bharat

Former Member
0 Kudos

Hi,

i donot think the Avilability of standard report as per your requirement. if u dont want report in excel then better create customized report using PLAF table.

if it is useful reward and close the thread.

regards

pradeep