Hi
I have some problems with update in SRM. The two jobs CLEAN_REQREQ_UP and BBP_GET_STATUS_2 are running but sometimes the documents are not updated before I run "Syncronize with backend" (BBP_CLEANER).
Do anyone know what this program is doing??
The only description of the program I can find is that BBP_CLEANER is a update check. This program schedules a job to execute the report CLEAN_REQREQ_UP. This is then immediately carried out in the background.
As I understand this the program only execute CLEAN_REQREQ_UP but why is there a different result?
Thanks!
Hi
Which SRM version are you using ?
<u>Meanwhile, Please refer to following SAP OSS Notes -></u>
Note 1054605 No trans titles for BBPUM01, BBPUM02, BBPAT05, BBP_CLEANER
Note 840181 Calling bbp_cleaner using internal ITS
Note 532375 Synchronization with Backend does not run via Web
Note 1084987 Synchronizing documents and status between ERP and SRM
Note 1057933 Service package number not included in extended classic scen
Do let me know. Hope this will help.
Regards
- Atul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
See this link:
http://help.sap.com/saphelp_srm50/helpdata/en/24/64474ecfaf11d2b463006094b92d37/frameset.htm
<b>BBP_CLEANER
This program schedules a job to execute the report CLEAN_REQREQ_UP. This is then immediately carried out in the background.</b>
This is used to synchronise with teh backend IMMEDIATELY.Generally the update happens thorugh the job which you have scehduled in SM37 for report CLEAN_REQREQ_UP.If you run this tcode BBP_CLEANER,it created a JOB which then runs the report CLEAN_REQREQ_UP.So this as good as directly running the report CLEAN_REQREQ_UP.
BR,
Disha.
<b>Pls reward points for useful answers.</b>
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
See this link:
http://help.sap.com/saphelp_srm50/helpdata/en/24/64474ecfaf11d2b463006094b92d37/frameset.htm
<b>BBP_CLEANER
This program schedules a job to execute the report CLEAN_REQREQ_UP. This is then immediately carried out in the background.</b>
This is used to synchronise with teh backend IMMEDIATELY.Generally the update happens thorugh the job which you have scehduled in SM37 for report CLEAN_REQREQ_UP.If you run this tcode BBP_CLEANER,it created a JOB which then runs the report CLEAN_REQREQ_UP.So this as good as directly running the report CLEAN_REQREQ_UP.
BR,
Disha.
<b>Pls reward points for useful answers.</b>
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.