on 10-17-2007 4:25 PM
Hi,
I need to run the process chain every hour in Quality system. Do I need to make this schedule happen in Dev and transport it?
Or can I schedule this in Q itself? I tried this option and I don't seem to have modify access.
Thanks,
Pradeep
Hi Pradeep,
You should be able to manage the changes with Object Changeability option in RSA1 > Transport Connection > Object Changeability..make objects RSPC, RSPT and RSPV as changeable.
Hope this helps...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks much.
I tried to transport the chain and it returned the following error.
Error in remote call of destination Process-Chain-RFC
Message no. RSPC051
Diagnosis
The following error occurred during the remote function call for destination Process-Chain-RFC:
/ CPIC-CALL: 'ThSAPCMINIT'
System response
A short dump has probably been written in the other system.
Procedure
Look at the short-dump overview in the other system.
The chain is working perfectly alright in D.
Thanks,
Pradeep
Ignore...
Message was edited by:
Jr Roberto
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
88 | |
10 | |
10 | |
9 | |
7 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.