Dual -sourcing for two material

Sep 20, 2017 at 08:35 PM


avatar image

Hi Expert!

I need your help on finding solution for one of the request I received from business. Business is trying to do dual sourcing of a material from 2 supplier. Both the supplier would be supplying same physical part, but business want to have to different material number for each supplier in our SAP system because of some terms with suppliers. Now business want to procure from both supplier with 50/50 split of requirement/demand of the material.

let me explain the scenario, we have a physical part which can be procured from either Supplier 1 or supplier 2. Business wants to have different material numbers for each supplier for this physical part in our SAP system. Lets call Material A from supplier 1 and Material B from supplier 2. This physical part (Mat A/Mat B) goes into assembly of Material C. Required qty of this physical part is '1' EA in BOM of Mat C.

Business wants to do 50/50 split of requirements of the physical part (mat A/ mat B) between supplier 1 and supplier 2 for each Production Order/planned order of Mat C. or procure from supplier 1 for first Production order and from supplier 2 for second Production Order of Material C and so on.

This is similar to quota arrangement of 50/50 split between two supplier but our scenario includes 2 material. We cannot use Quota arrangement as it works for one material at a time.

We tried using alternative material functionality in BOM with 50 % probability for both material A and Material B, but system is doubling the required qty to 2 , 1 for each material. But required qty is only 1 and this can lead to over procurement.

We will really appreciate if anyone can suggest something on this.

Please note we use scheduling agreement with supplier for procuring. And I suggest business to go with one material number and use Quota arrangement, but they have long explanation why they want to have different material number for both suppliers.

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

2 Answers

Andy Pataselano Sep 22, 2017 at 02:03 AM

You can use alternative item group in BOM. Please refer to

10 |10000 characters needed characters left characters exceeded
PRASOON AK Sep 22, 2017 at 02:00 PM


Instead of creating duplicate material codes, I would suggest to check whether you can go ahead with one material and use batch management or split valuation to differentiate the material from supplier. Even, you can mention the split valuated valuation type or batch number in the PO itself and differentiate in the PO level itself and in the output as well. In this case, you can use all the standard functionlities like quota arrangement, source list, MRP etc.