Existing 2 node EP6.0 SP19 cluster
Wanting to add additional nodes but having installed a dialog instance (with the SR1 installation), it wont start with the message:
running D:\usr\sap\PRT\J02\exe/sapstart.exe name=PRT nr=02 SAPDIAHOST=dowc384343 -wait
SAPSTART finished successfully on dowc384343_PRT_02, but at least one process doesn't run correctly:
D:\usr\sap\PRT\J02\exe/sapstart.exe=>sapparam(1c): No Profile used.
Is this because the rest of the cluster is SP19 and this instance needs to be patched before it will start or is there something else more wrong here?
The one thing that does concern me - it doesnt appear to have created the directory structure correctly - for example I have no configtool or visual admin and it looks like a lot of other directories are missing.
Anyone with any advice - I would have assumed that the node should start but throw plenty of sync errors since its an incompatible version until patched?
There were one or two warnings during the installation but nothing I could really attribute to causing a problem.
Haydn