Creation of company code in SRM.

Hi Experts,

Do we can replicate the company code into SRM which is already existing in R/3.

Or we need to Maintain this through PPOCA_BBP.

Best Regards,

Sairam.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Oct 15, 2007 at 08:32 PM

    Hello Sai,

    You must replicate addresses from your backend system (including company codes), using report BBP_LOCATIONS_GET_ALL or BBP_LOCATIONS_GET_FROM_SYSTEM.

    The company code is assigned in your organizational structure, using PPOMA_BBP. (PPOCA_BBP is used only for creating the root node).

    Hope this helps.

    Regards,

    Gilberto Gallardo

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 16, 2007 at 04:56 AM

    Hi Sai,

    You have to create the root org using PPOCA_BBP transaction in SRM and then create the remaining org. structure like Co.code, P.Org, P.Group using PPOMA_BBP transaction.

    In the function tab of the Co.Code you link the SRM co.code to back end R/3 co.code. You can have the same company code in SRM as that of R/3.

    And also you link P.Org and P.Groups with the back end R/3 in the function tab.

    The report BBP_LOCATIONS_GET_ALL mentioned by Gilberto is for replicating plants from the back end R/3.

    Hope this makes you more clear. Clarifications are welcome.

    Rgds,

    Teja

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Sai,

      As explained by Ashutosh, you don't need to replicate the co.code,P.Org & P.Group from the back end R/3 to SRM.

      Only the plants, vendors,Storage locations get replicated from back end along with the Material master and service master.

      As i said in my previous reply, the linking happens in the function tab where you mention the back end co.code along with the logical system.Also you maintain the co.code (back end), Accounting system for vendor, system alias etc in the attributes tab.

      The logical system settings are defined in the SPRO by setting up ALE settings and the definition of back end system.

      Hope this will make you more clear.Clarifications are welcome.

      Rgds,

      Teja

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.