Senario:
2 BAPIs are developed:
1. The information say... ABC is stored into the table from the portal using the Create BAPI.
2. The change in this ABC information is done using a particular <b>Tcode</b> say xyz. This is a report that calls the change BAPI inside.
The ABC information change will be done either through the Tcode in ECC or through the EP.
3. The Tcode has been created in ECC.
Please let me know who will be responsible to call this tcode from the Portal and how?
I am very very new to EP field so please help...