Skip to Content
author's profile photo
Former Member

In descrete manufacturing i want to use back flush process

Hi,

i want to use backflush in descrete manufacturing. what is the process to be followed for staging.

i want to stage extra material than what i require .can i do that. how to do that activity.

regards

madan

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

1 Answer

  • author's profile photo
    Former Member
    Oct 11, 2007 at 04:31 PM

    Madan,

    I would suggest you to create a separate storage location from where materials can be back flushed assign this as the Issue storage location in the BOM item details.

    1. Create Prodution Shop Storage Location

    2. Extend materials to this storage location using MMSC transaction.

    3. Assign this storage location to the BOM components in the Item details.

    4. Do Stock transfer(Staging) using MB1B transaction and Movement type 311. You can stage how much ever material.

    5. When Backflushing you consume as required from this storage location.

    Hope you know where to define backflushing.

    1. In the Material Master you can define,

    2. In the Workcenter you can define

    3. In routing you can define

    4. In the order Component overview you can define.

    Hope this helps....

    Regards,

    Prasobh

    Add comment
    10|10000 characters needed characters exceeded