Former Member
0 Kudos

I am looking for a table where i can get the TOTAL activity minutes. Total acitivyt minutes should include the minutes of the semi-fnished under a Fert, if i am looking for a Fert. I can get the costs from KEPH but i am actually looking for total minutes. Plz help

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member188826
Active Contributor
0 Kudos

Try CKIS

CKIS has it, but the problem is, it is only for the top level material, you have to select the cost estimate number of all the sub components involved to get the total. Some program may be required. But the data is very much there.

Former Member
0 Kudos

Sridhar,

We are using CKIS now. As you said it is showing up only top material minutes. but business needs to see the total. so i am looking for a way out.

Former Member
0 Kudos

Hi,

In case of using table COEP and transfering datas into Excel or building simple Query based on table COEP it is possible to show all activity minutes.

As selection criterias I propose to use:

- Controlling Area

- Period

- Year

- Ledger ( in case of using Standard Ledger, write always 0 )

- Value type (04 - Actual)

- Object number ( "KLK<i>CoArea</i><b>4-5times zero</b><i>CostCenter</i><u>Activitype</u>" ... example: <b>KLK</b>1111<b>00000</b>99999<b>AT1_M</b>

Hope it helps

Former Member
0 Kudos

Hey,

I am actually looking to pull the minutes from standard cost (routings used in standard cost) of a material. The logic you said looks like it is for actual postings. please correct me if i am wrong

former_member188826
Active Contributor
0 Kudos

Yes, what I refererred was from current standard cost estimate.

The routing data is stored in PLPO. They have a field PLNNR which is group no. You may get this from MARC table or MAPL.

Former Member
0 Kudos

Sridhar,

I am able to read the group no from MAPL . i checked with the group no in PLPO but couldnt match the data in PLPO to the minutes in standard costing. Any idea?

former_member188826
Active Contributor
0 Kudos

The value you pick from MAPL should only when the Task list type PLNTY is N which is routing. There can be other values like Q - Inspection plan.

Former Member
0 Kudos

I am able to see them. If i am not wrong, in my situation i need some program which will find the materials under the top material and find their routings from MAPL and pull values from PLPO. Correct?