Transaction Code Required

I have maintained planning periods for my info structure as weeks in MC7F....because of which data is uploaded in weeks format

But is there any transaction which shall enable me to view this months format??

How do i view my forecast in months format instead of week

Rgds

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Oct 11, 2007 at 09:44 AM

    Create a planning type for the info structure with the required key figures using MC8A.

    Enter the planning table using the same planning type with T.code MC94, then go to Edit--period splitting-- Total--- Months

    Hope this works for you.

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      I think this works only if there are no periods defined in the infostructure in MC7F.

      You can change the period unit of either the entire planning horizon or a preselected part of it on the following conditions:

      The planning method of your information structure is level-by-level (standard SOP or flexible planning).

      No storage periodicity has been defined for the information structure in Customizing (in Set parameters for info structures and key figures).