Master Plan Report

What is mean by Master Plan Report ?

This is something used to generate master plan forecasts.

Please share your view / other information / T-code related to this ?

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Oct 11, 2007 at 07:46 AM

    Hi,

    As far as i'm concerned, i hope u mean to say "Master Plan Report" as "Master Production Scheduling - MPS ".

    Here is some points:

    The aim of MPS is to reduce storage costs and to increase planning stability. This is useful in the following cases:

    - To ensure that there is good material availability, various floats and a safety stock are entered, which inevitably lead to high stock levels. Thus, high storage costs are incurred, especially for valuable materials.

    - The master plan of these materials greatly influences the entire production process: The planning of the dependent parts depends on the planning result of the finished products and main assemblies, even if the finished products represent a small share of all the materials to be planned. Frequent changes at finished product level can render the complete MRP run unstable.

    Check up the foll. link too :

    http://help.sap.com/saphelp_47x200/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm

    - Thaila Shree