materaial determination

hi

can the material determination can check the status of the material ( if the material launch date and end date maintained in the material master)

if not can we do the same by using the USER EXITS??

Is there any user exits provided by SAP in material determination

OR we need to go for the system modification

help me out by giving some solution.

thanks

ramesh

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • avatar image
    Former Member
    Oct 10, 2007 at 05:08 AM

    Hi Venkata

    Material determination is its swaps the obsolute material with new material.

    Here there is no need for userexit.

    But still if u want to know the Valid date and end date of the material. U can maintain these in Materail master.

    Go to Plant data/storage 1 View:

    Below u will see the SELF LIFE DATA.

    ENTER

    The Max. Storage period

    Min. Rem shelf life life

    Reward if useful to u

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Oct 10, 2007 at 05:18 AM

    Material Determination generally swaps the existing material with a new one based on the company marketing strategy. You can maintain the material life in Sales Org 1 screen of the master date, through valid dates... You can also use the plant data 1 screen to maintain the shelf life.

    Usually people maintain the x chain distribution list in Sales org 1 screen to maintain the warning genrated when an material reaches end of life.

    Thanks

    Award points if helpful

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Oct 10, 2007 at 05:31 AM

    Ramesh,

    Material determination will be done for the materials which were obsolete in status. SYstem uses the field X-Distribution status of MARA table to determine the status.. This is standard..

    IF you want to do any more checks before applying the determination rule, you can achieve this by coding a custom Requirement routine and assign this in the requirements field of the condition type Material determination procedure.

    YOu can see this in SPRO->Sales and distribution / Basic functions / Material Determination / Maintain Prerequisites for material determination / Maintain Procedure

    Regards,

    Ajai

    Don't forget to reward points if helpful.