Skip to Content
avatar image
Former Member

materaial determination

hi

can the material determination can check the status of the material ( if the material launch date and end date maintained in the material master)

if not can we do the same by using the USER EXITS??

Is there any user exits provided by SAP in material determination

OR we need to go for the system modification

help me out by giving some solution.

thanks

ramesh

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Oct 10, 2007 at 04:57 AM

    Hi,

    Check the requirements routine in the transaction VOFM..

    In the transaction in VOFM..

    REQUIREMENTS -> MATERIAL DETERMINATION..

    create a new routine there..check for existing routines..Then assign this routine to the material determination..

    Thanks

    Naren

    Add comment
    10|10000 characters needed characters exceeded