cancel
Showing results for 
Search instead for 
Did you mean: 

Backflush with no BOM

Former Member
0 Kudos

Can I Backflush a Finished Good that has no BOM but has a routing with materials assigned to the Component allocation?

Kind regards,

Guy.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Guy

It is impossible to assign componets to a Routing without a bom ACCORDING TO MY KNOWLEDGE.

SAP will not allow you to assign component and it will ask to create a BOM

BR

SK

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi Guy

first of all like above been told , you cant assign material in routing without BOM

and Backflush means issue of component , which is BOM items

Cheers

Bala

former_member184655
Active Contributor
0 Kudos

Dear Guy,

What Mr.Ganesan has asked is a valid question ,once if your material is not

having a valid BOM,you can not carryout the Component allocation in rate routing.

The system pops up whetehr you want to create a BOM.

Regards

Mangal

former_member184655
Active Contributor
0 Kudos

Dear Guy Hall,

Can you please tell me whether your finished product has got a production

version,product cost collector?

Regards

Mangal

Former Member
0 Kudos

Hi

The back flush functionality is for components & not for the materials.

I hope you are referring to materials assigned means header materials assigned to routing.

If my assumption is correct, it is not possible to backflush.

Regards

YMREDDY