Skip to Content
author's profile photo Former Member
Former Member

Upgrade from 4.7C to ECC 6.0

Hi Gurus,

I am going to do a functional upgrade from 4.7C to ECC 6.0 (classic GL, not new GL). Can someone please list me the steps that I need to do to achieve the upgrade.

I would be very grateful and would assign points as a gesture of appreciation.

Thanks

Chandan

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Oct 08, 2007 at 11:53 PM

    If you are not going to implement new g/l, then all you have to do is test if all the transactions that the client is using are wokring fine in ECC 6.0 or not.Do the unit testing and integration testing and get business sign off.

    Assign points if helpful

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.