Hi

After Running cost estimate-The costs of Raw materials in itemisation and in cost component view is different.Why there should be difference these two outputs as far as raw material cost is concerned.

Any suggestion

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Posted on Oct 08, 2007 at 04:00 PM

    Is the total cost agreeing? Check the Cost component layout assignment.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 08, 2007 at 07:43 PM

    hey,

    it depends on the cost elements you have assgined to cost component structure. Check if the total costs in both views are same, then it is matter of the cost elements assginment in cost component strcture. Check OKTZ for cost component structure.

    Assign points if helpful

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.