Hello all,
i read a lot of post about this issue but i can not find a solution for our problem.
We have installed a HR Backend system (ECC 6.0) and Portal (EP 7.0). During the project we receive the task to switch the Portal to another Training-Backendsystem client 060. (In this backend system is still another Portal connected to client 010). Afterwrads we change all steps in SLD and JCO-destinations and so on. We download also the verify.der and upload this file in the nwe backend system. But we always get the samm error.
Have somebody the same experience or any idea to solve this issue?
Thanks a lot!
Markus