cost roll up-urgent

Dear All,

When I go for costing(ck11n) say for finish mat. in new month(period), all my semi-finish and raw material cost should roll up for costing for this period means new cost estimate should automatically be made for all my semi-finished and raw materials and/or otherwise it should give error/info that required semi-finished material is still not costed for this period.

Pl. suggest the settings for this.

Regards,

Vijay

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Oct 08, 2007 at 10:35 PM

    you dont need special configuration for this. If you have proper BOM and routing which has Semi finshed goods and Raw materials, then it should automatically will update the SF goods and raw materials.

    assign points if helpful

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 08, 2007 at 09:37 PM

    No extra setting is required.....

    If you have configured your costing variant properly thats enough......

    CK11N - perform costing run....

    Now you need to go to CK24 to mark/release the cost estimate.....Here you need to give co code, plant and material....

    If you dont give material it will automatically select everything (this includes your raw material and semi finished material).......

    An easier way is to use CK40N........

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Oct 09, 2007 at 02:15 AM

    As you need new cost estimates to be calculated automatically for the sub components, you need to resort to the mass run of cost estimates offered by the transaction code CK40N. Costing run is divided in three parts General Data, Processing and Costing Results.

    Here you create a costing run with any name for a current date. Under the Processing tab, you specify the plant and the top level material in the area relating to selection.

    Following this, you do the structure explosion. When you do this, you get to see all the sub components also picked up for costing. You can view the list of materials in the Costing results portion. Choose material overview to see the list.

    You can try with a finished product as well.

    When you follow through the end of the costing run, you can view all the cost estimates available for marking and release.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.