hello GURUs
my PP person is geting this problem
wen he is creating make to order planning multi level
t-code is MD50
Sales order does not allow make-to-order production
Message no. 61155
Diagnosis
The sales order entered is not to be included in make-to-order production.
System Response
Account assignment can only be carried out with sales orders created with a requirements type for make-to-order production.
Procedure
Enter a sales order that is to be included in make-to-order production.
please help me to resolve this issue
thanks in advance
subrat
9313480938
subratpanda23@gmail.com
Message was edited by:
subrat panda
Message was edited by:
subrat panda
hi panda,
you can create production order within sales order.
first of all check your item category , in the sub-screen Bill of Material Configuration
in the field Application there must be PP01.
Next step is to configure your requirement class.
Among other things you have to specify the order type for the requirement class.
Create a req type and assign it with your req. class.
After that assign the item category and MRP Type with the Requirement Type.
I can sent you the paths of these settings if you want.
Best regards
George
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
First you have to check the sale order material.
you go to MM02-> MRP3->PLANNING->Strategy group
Regards,
T.Murugu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Subrat,
Check item category back end settings of sales order
in that T-code is VOV8 check doc assigned settings
Hope problem here only
Prem
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Subrat,
Tel your SD Person to check item category & condition type (Procurement section in so)...Check whether its appropraate for Make TO Order one.(out of 011/021/031/041/Customised)
IT SHOUD BE SAME AS per confign...If not manually put reqt type & save SO..
Again Try creating in MD50..
REWARD IF U FINDS THIS AS HELPFUL..
Regds
MM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
i ve removed the atp in each of this level
but then also he is facing the problem
as per logic if a order look for stock first then its not a make to order so we have to remove the all check in order level scheduline level to make it a make to order production
i m the only sd guy here in testing i m geting this problem
so wen the make the atp was there i think it was coming
i ve removed all the atp checks
still he gets the problem
wat more we can do from SD side please suggest
regards
subrat
i ve found the fault
its in sales order the procuremnt tab we have the requrement type colomn
wen we put KE the the order is make to order
but wen something else the requirement is not make to order
so mine by default its coming KE
so how to make it KE
wat is the setting for automatic assignment of KE to sales order
please suggest the way to it...
with regards
subrat
hi,
plz check the item catergory that is getting determined in the sales order. make sure its tak and a schedule line is assigned to it too.
saurabh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I dont know much abt that.. but plz do check the Schedule line category/Req Class etc
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.