on 10-05-2007 3:20 PM
Dear friends
What are the steps needed to configure your TAK(make to order)
With Regards
Sankalp Singhai
<REMOVED>
Sankalp,
Make-to-Order (MTO) Production
Purpose
The planning strategies explained in this section are designed for the production of a material for a specific individual sales order. In other words, you do not want to produce finished products until you receive a sales order. This means that make-to-order strategies always support a very close customer-vendor relationship, because your sales orders are closely linked to production.
The same relationship exists between the sales order and production that exists in a make-to-order environment. Make-to-order is also used in the following environments.
Production using variant configuration
Assemble-to-order
Prerequisites
Choose a make-to-order strategy, if:
The materials are segregated. In other words, they are uniquely assigned to specific sales orders.
Costs must be tracked at sales order level and not on material level.
Make-to-order strategies should always be combined with lot-size key EX (lot-for-lot. Rounding values should not be used. If you maintain rounding values, they have no effect due to the make-to-order properties of these strategies.
Process Flow:
There are extensive options that enable you to procure components especially for specific sales order items.
You may, however, want to use a different planning strategy to procure components without sales orders. This allows you to keep your replenishment lead time to a minimum. You can do this by:
Planning on the basis of the finished product (see Planning Without Final Assembly (50) or Planning with a Planning Material (60))
Planning at component level (see Strategies for Planning Components)
Using consumption-based or Kanban-controlled components
Customer stock can exist on any BOM level. See Stockkeeping at Different BOM Levels for more information.
Because production is closely linked to sales orders, this results in a customer section in the stock/requirements list.
Unplanned goods receipts (such as returns) cannot, as a rule, be used for other sales orders, even if they are in working order, unless they are adapted to meet a customer's needs.
In the basic make-to-order strategy, Make-to-Order Production (20), no specific product structures are required. This means that it does not matter if the material has a BOM or not. The material can be produced in-house, or it can be procured externally. No planning is involved in this strategy.
Planning Without Final Assembly (50) and Planning with a Planning Material (60) do require a specific product structure (i.e. a BOM, which means materials are always produced in-house). These planning strategies assume that you want to plan procurement (production or purchasing) of your components by planning the finished products. This means that you need to have a fairly stable demand for your finished products. If, however, you can plan more easily at component level than at finished product level, see Strategies for Planning Components.
Configuration Settings:
Create material master by maintaining general item category group- 0001(make to order)
Availability check - 02
Transportation Group - 0001
go to va01 and raise sales order
item category:TAk
Schedule line category : cp
Requirement type KE
Requirement class 040
Check TOR and avalability check
special stock : E
VOV7
of TAK
billing relivence : A
Pricing :X
go to mb1c
maintain stock with a special stock indicator E
mavement type 61
Special stock E
specify sales order number line item number and saveit
go to VL01N main data
Go to VF01
save it
REWARD IF U FINDS THIS AS USEFUL...
Regds
MM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Sankalp,
Let the scenario be:Scenario:
The Feed Material is produced against an Sales Order. Feed has a BOM, Routing which are costed in Sales Order. Some Extra Medication (Not part of BOM) is added to the feed as per the insructions from the customer. The cost of which is accumulated in the Production Order. The requirement is Actual Cost is to be transferred to Sales Order to enable Pricing based on Actual Costs.
Now configuration:
a. We are using Strategy Group 20 in material master.
b. The Requirement Class determined is 040.
c. Strategy Sequence for Settlement Profile is SAP020.
d. The Settlement Profile that is used is SD1.
e. Costing Variant that is used is ZPP4 (Product Costing) which is copied from PPC4.
f. Account Determination in Requirement Class is E.
g. All Raw Materials, Semi Finished Materials and the Finished Goods are at MAP.
h. The Pricing Procedure in SD is using Standard Condition Types VPRS, EK01 & EK02 in this order.
Steps:
1. Created Sales Order and also Estimated Product Cost. The Cost is now carried in EK02.
2. Run MRP for creating Planned Production Order for this Sales Order in MD02.
3. Converted Planned Production Order to Production Order in MD04.
4. Released Production Order CO02.
5. Confirmed the Production Order by adding Additional Material which is not existant in BOM in CO11N.
6. Automatic Receipt of Finished Goods into Finished Goods Inventory at the time of Confirmation in CO11N.
7. Verified the values in KKBC_ORD.
8. Executed the Settlement (Sender is Production Order and Reciever is the Sales Order) in KO88.
9. Verified the Values in Sales Order, the Condition Type EK01 is not populated with Actual Cost of the Production Order.
Hope it helps.
Regards,
Priyanka
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
can elaborate your requirement.i didnt get what exatly you are looking
Prem
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sankalp
First Create a material with MM
Basic data 1:
Give Material name : Cycle
Material group : 010
Division : MA
Net Weight : 10 Kg's
Gross Weight : 10Kgs.
Sales: Sales org.1 :
Base Unit of Measure : EA
Delivering Plant : RAMA
Output Tax : 1 ( Full tax)
Sales: General/Plant :
Availability Check : 01 ( Daily Requirements)
Trans.,group : 001
Loading Group : 0003
MRP 1:
Mrp Group : 020 ( Make to Order Production)
Mrp type : PD (MRP)
Mrp controller : 000
Lot size : EX ( Lot-for-Lot order quantity)
MRP 2:
Inhouse Production : 1
Schedule Margin Key : 000
Forecasting:
Forecast Model : D (Constant Model)
Accounting 1:
Price control : V ( Variable Price)
Variable Price : 4000
Price Unit : 1
Then enter & Save.
Material 769 created.
Create a Sales order with VA;
Order type : OR
Sales Organization : RAMA
Distribution Channel : RA
Division : MA
Sales Office : RAMA
Sales Group : RAM, .............. Enter
Sold to Party : 6000000000
PO number : 55 , PO Date : 04.06.2007.
Item Overview Tab:
Material 769, Quantity : 100
Enter & Save the Document.
Sales Order 8212 Created
Create Production Order with CO:
Enter Sales order number: 8212, Item No. 10
Order type : PP, Enter
Click on FLAG,
Select Generate Operation and enter NO,
save the Document.
Production Order Created : 60002725
Confirm the Production Order with CO15.
Enter Production Order No. 600075 and save the Document.
Now the confirmation Order will be saved.
Create Goods Receipts with MB31.
Movement type : 101
Order : 6002725
Plant : RAMA
Storage Location : RAMA
Enter and Save, you will get Document Posted : 50000068931posted.
Check the Stock Position with MMBE
Material : 769
Plant : RAMA
Storage Location : RAMA
Execute (F8), Here we can see the stock at Sales Order Stock.
Create Delivery with VL01N, Billing with VF01 and Post to Accounts.
Reward if useful to u
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.