How can we report a blanding operation of two batches from same material into a new batch ?

In our manufacturing process, there is an operation where two or more volumes of different batches from same material are blanded into a new batch.

When trying to create production order with same ingrediants as the target product an error is raised:

Component cannot be equal to the production item [Production Order - Rows - Item No.][line: 1] , 'Row no. 1' [Message 3702-9]

what is the right method for reporting such an event