Skip to Content
author's profile photo Former Member
Former Member

overriding of academic calendar

Hi All,

I want to attach one calendar to a program of study. so that it override the session defined in the calendar attached with its org unit.

I did it, but still its taking the period from the calendar attached with Org unit. I also assigned ' ' in general evaluation of academic calendar.

what could be the problem?? Please suggest.

regards, Sudhir

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Oct 05, 2007 at 05:17 AM

    Hi Sudhir,

    Always academic calendar should be attached only to the Org unit and not to the program of study . Basically , if you want to have a different academic calendar for each progarm of study , vary your sessions in the same academic calendar with the dates you want to define for each program of study .

    Can you explain your scenario in a clear picture ?

    Regards

    Gajalakshmi

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Thanks Michael,

      You was right :)...but at that time I checked that also...

      But at that moment I did not made the necessary configuration in the IMG "Different Evaluation Path".. and when I made these configuration with a new structure Then I made a sili mistake regarding the validity.. ;)...

      Actualy you always points to the real time blunders wihch a person generaly makes in real time senario... :).. and mostly you are right..

      Thanks for your contributions in the community..

      and be remain so smily and joyfull ;)... because I will definately keep on doing such mistakes in future also :D.... so be ready for that..

      thanks and regards..

      Sudhir... 😊

  • author's profile photo Former Member
    Former Member
    Posted on Oct 04, 2007 at 08:43 PM

    One possible problem may be with your validity range of the relationship between the calendar and the program. What is the start/end date for the relationship? It is possible that for the key date where you are pulling up the sessions, this relationship is not valid, so that the system is still looking up the org structure to find another calendar.

    Also, it would be helpful if you described exactly what process you are talking about. Is it admissions, registration, module booking, or something else?

    Michael

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.