cancel
Showing results for 
Search instead for 
Did you mean: 

Determination of cost center dynamically for same GL during STO PGI

Former Member
0 Kudos

Hello,

I have a requirement where I have maintained a delivery condition in STO PO and the required mapping to hit the GL for delivery condition during PGI (641) is done. The requirement in Storage location STO case is,

1. When PGI (641) is posted is posted for Material "X" or from Issue location "X", the cost center for the GL should hit say "CC1"

2. When PGI (641) is posted is posted for Material "Y" or from Issue location "Y", the cost center for the GL should hit say "CC2"

So, the cost center will vary based on either material or any other parameter say "Issue storage location".

Please suggest how can the required entry posted.

thanks

Accepted Solutions (0)

Answers (0)