Skip to Content
author's profile photo Former Member
Former Member

STO Scenario - Planned GI date and Delivery date are same

Dear Gurus,

The related threads and comments for similar problem did not solve the issue. Please support.

I am creating an STO order with item which has planned delivery time of 14 days along with Route which has 5 days of transit time.

Shipment scheduling and Route scheduling is activated in IMG for the combination of PO type - Delivery type. ( set up STO)

Availability check is controlled by APO system.

When i create delivery through VL10B, the planned GI date should consider the route lead time and should not be same as delivery date. But in my case, it is the same.

For example, Delivery date in STO PO - 25.09.2017 ( incl planned delivery - system proposed after APO check)

Route - 5 days transit time.

OBD from STO is expected to have 20.09.2017 as planned GI date. But it is also 25.09.2017

Please share your thoughts

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.