Skip to Content
0

error when try to settle in pool asset management

Sep 12, 2017 at 02:50 PM

82

avatar image
Former Member

hello SAP gurus,

I implemented the SAP pool asset management and everything is fine but when i try to settle i get to choose the actyvity type i configured previously. but when i click on save a get the following error.

System error: Error when copying parameter function group CR01

i search an found that i need to link to a workcenter and a plant which i did .

pls help since i need to deliver this work ASAP.

thks

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

3 Answers

RAKESH MANE Sep 13, 2017 at 06:21 AM
0

Hello

Did you maintained the activity type ,Cost Center in KP26.

If not ,please do the same.And test ths functionality with newly created data.

Br

Rakesh

Show 5 Share
10 |10000 characters needed characters left characters exceeded
Former Member

hello ,

the activty type are created an linked to the cost center when i try to settle i find the activity type i set previously but the problem occur when i settle the final price .

BR

Alaa

0

Hello

Please assign activity type on work center.Assign the work center to work order.

This activity type and cost center should have Rates define in KP26.

BR

Rakesh

0
Former Member

hello,

when i try to assign activty type to work center i need to choose a formula. i defined an activty type named rent01 that has a unit in DAY , what should i assign to as a formula ?

BR

ALaa

0

Hello

Try to use SAP008

Br

Rakesh

0
Former Member
RAKESH MANE

hello,

i did the sap008 the system took it now i created a work order for an equipement in the operation tab what should i maintain for the the activty type rent01. i still getting the same error even aftet defining the formula in the cost center.

thanks Rakesh

BR

Alaa

0
Peter Atkin Sep 13, 2017 at 06:26 AM
0

Ensure that you have an operation control key in the order operations.

Can you send some screenshots of:

  • Work centre costing tb
  • Order operation overview tab.

.

https://launchpad.support.sap.com/#/notes/1274231

PeteA

Show 2 Share
10 |10000 characters needed characters left characters exceeded
Former Member

hello,

HEre is the screenshoot of my worcenter costing tab pete i dont know relevant data to input in it for the usage of pool asset mangement get confuse whit the formulas that i need to put in for the activity type . FOr the order operation i didn t touch this in the config dind t know that it was also necessary for it please can you provide me with guidelines to follow for entering the control key. Sorry i m really new to SAP but thanks for the reply guys concerning the secondary cost element the activity type and the cost center i think everything is set right . Also the note is obselete and cannot be implemented in my sytem.

BR

Alaa

costing-tab.png (29.8 kB)
0

Hi,

You need to have an operation with work center assignment, refer below thread for more information

https://archive.sap.com/discussions/thread/550921

Also try to change cost center start date from 11.09.2017 to 11.09.2016 in the work center, check whether you get the values.

Regards

Terence

0
Peter Atkin Sep 13, 2017 at 11:38 AM
0

alaa mellouk

Please send a screenshot of the Operation Overview screen in the order.

PeteA

Show 4 Share
10 |10000 characters needed characters left characters exceeded
Former Member

hey pete,

here the screenshot of both costing tab that i used to for the ork order and the work order operation tab

costing-tab.png

operation-tab.png

BR

Alaa

costing-tab.png (29.4 kB)
operation-tab.png (23.7 kB)
0

I dont see the work centre in the operation screen??

Also, backdate your work centre dates to before the order basic start date (say 01.01.2017).

Also, recost the order (button in order header) and check if there are any costing errors - if so, then let us know what they are..

PeteA

0
Former Member

hey Pete,

THanks for your replay well here i ll send you a more info trough some screenshots i took

the orignal error

original-error.png

the actitivy type i set for the cost center

activity-type.png

the work center settings

work-center-basic-data.png

work-center-capacity.png

costing-tab-work-center.png

an now the operation tab in th work order

operation-tab-in-work-order.png

like you see now there is a workcenter defined in operation tab i also change the date for the cost center but i still got the error in the planning board in pool asset maangemnt also can you please see if the activity type set in the operation tab are right please

thanks alot Pete

BR

Alaa

0

Check OSS for any suitable notes

What is the error message number?

PeteA

0