Hi

Can anyone tell me how to use inbound deliveries with scheduling agreement.

-Prabu

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Dear Friend,

Obviously. We can do I/B delivery against SA.

Use tcode VL31N. Enter ur vendor & PO no. that is SA no.

Check for delivry qty [it is picked up from delivery scedule]

Just save it.

Reward points if this helps u

Tushar

Former Member
0 Kudos

Best way for using Inbound delivery is to have a confirmation control key for the

Vendor. For the confirmation control key you can control the creation of Inbound deliveries.

Once done you can create the Inbound delivery for the schedule line agreement.

Hope it helps.

Thanks ,

Tausif

Answers (2)

Answers (2)

prashant68097
Explorer
0 Kudos

Tested on ECC and S4 Hana 2020.

To created Inbound delivery with SA, have info record in place, make sure you enter the confirmation control key 0004 for inbound delivery in PIR, So when you create SA, system will pick it. If not, you have to enter the confirmation control key 0004 at the item level in SA.

Then you can go to VL31n, enter the SA number in PO number place and supplier, and you should be able to do it.

ozge2020
Discoverer
0 Kudos

Dear Prashant,

Your comment solved the question mark in our situation. This is what we faced and still have open points. There was a vendor SA without confirmation control key. We have been using it for 3 years without ASN/ inbound delivery. GR is doing via SA. Now, we are going to receive ASN, so we have to put 0004 as confirmation control key. But system doesn't let us to do via ME32L since there have been goods movement with the current SA. Thats why we are putting it on EKPO - BSTAE. After this, we able to receive ASN/create inbound delivery. The problem is; after inbound delivery creation, on MD04- instead of reducing qty from SA line, system increase requirement. As an example, on SA requirement is 45 pcs, we are creating inbound delivery with 5 pcs. I am expecting to see 40 pcs. But, system sums up the inbound delivery qty.

After i read your answer, i have created a new SA with control key 0004, and it worked. With the new SA, system reduced inbound delivery qty from SA.

Do you have any idea, how can i solve this problem without creating new SA?

Thank you

Özge

Former Member
0 Kudos

Dear Prabu,

We canot do inbound delivery in scheduling agreement.we do only in GR

we canot use any were in scheduling agreement

Hope this helps you

Prem

Former Member
0 Kudos

Hi Prem,

I have checked in the system,Inbound delivery is possible in scheduling agreement.It is in the item level.

-Prabu