cancel
Showing results for 
Search instead for 
Did you mean: 

How to Send the material master data from sap4.6c to ECC6.0

Former Member
0 Kudos

Hi

Friends this is shalini Shah, i got one requirement that is

how to send the materail master data from SAP 4.6C to ECC6.0 using XI.

i know the file to idoc and idoc to file scenarios but i don't know this one.

please help me friends, Thanks in advance.

Regards

Shalini Shah

Accepted Solutions (0)

Answers (6)

Answers (6)

former_member192892
Active Contributor
0 Kudos

Hi guys,

I have a stupid doubt and pl forgive me for this

Is it necessary to involve XI in between IDOC transfers from R/3 to ECC???

I guess involving XI would help in monitoring better as according to this blog

/people/michal.krawczyk2/blog/2005/11/21/xi-idoc-to-idoc-tunneling--how-fast-and-easy-can-you-get

Thanks

Varun

Former Member
0 Kudos

Hi this is shalini shah

i didn't used BPM, Please tell me the normal process.

Regards

shalini shah

Former Member
0 Kudos

Dear Jag

I didn't used the BPM, PLZ tell me the normal process of IDOC(SAP 4.6C) TO IDOC(ECC6.0) using XI.

Regards

omkar

santhosh_kumarv
Active Contributor
0 Kudos

Hi Shalini,

To trigger IDoc these configurations should be done in the SAP 4.6, XI and ECC 6.0.

SAP XI

1) RFC Destination (SM59)

a) Choose create.

b) Specify the name of the RFC destination

c) Select connection type as 3 and save

d) In the technical settings tab enter the details SAP SID/URL and system number#.

e) Enter the Gateway host as same details above SID/URL.

f) Gateway service is 3300+system number#.

g) In the Logon /Security tab, enter the client user & Password details of Destination system.

h) Test the connection and remote logon.

2) Create Port (IDX1)

a) Select create new button

b) Enter the port name as SAP+SID (The starting char should be SAP)

c) Enter the destination client.

d) Enter the RFC Destination created in SAP R/3 towards other system.

e) Save

3) Load Meta Data for IDOC (IDX2)

a) Create new

b) IDOC Message Type

c) Enter port created in IDX1.

SAP R/3 (4.6 and ECC 6.0)

1) RFC Destination (SM59)

a) Choose create.

b) Specify the name of the RFC destination

c) Select connection type as 3 and save

d) In the technical settings tab enter the details SAP SID/URL and system number#.

e) Enter the Gateway host as same details above SID/URL.

f) Gateway service is 3300+system number#.

g) In the Logon /Security tab, enter the client user & Password details of Destination system.

h) Test the connection and remote logon.

2) Create Port (We21)

a) First Select Transactional RFC and then click create button

b) Enter the destination port name as SAP+SID (The starting char should be SAP)

c) Enter the destination client.

d) Enter the RFC Destination created in SAP R/3 towards other system.

e) Save

3) Create Partner Profile (WE20)

a) Create New

b) Create the Partner no. name as same the logical system name of the destination system.

c) Select Partner type LS

d) Enter details for Type: US/USER, Agent, and Lang.

e) Click on the + button to select the message type.

f) Select Partner no. and LS which ever create above.

g) Select Message type

h) Select Process code related to the Message type.

I) save.

Also go ther the Blog <a href="/people/swaroopa.vishwanath/blog/2007/01/22/ale-configuration-for-pushing-idocs-from-sap-to-xi Configuration for Pushing IDOC's from SAP to XI</a> By Swaroopa Vishwanath

U need to import the IDoc types both inbound and outbound to XI.

1. Create Inbound and Outbound Message interface.

2. Do one to one message mapping.

3. Define an Interface mapping.

ID:

1. Create 1 Sender aggrement.

2. Create 1 Receiver aggrement.

3. Define 1 RD and ID.

4. Only create an receiver IDoc CC.

Regards

San

<a href=" to set the thread to solved when you have received a solution</a>

Where There is a <a href="https://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/sdn/weblogs?blog=/weblogs/topic/16">blog</a> there is a Way.

Former Member
0 Kudos

Dear Monika

i didn't used the BPM.Using RFC's ,please tell me the process.

and i don't know the how to give the reward points(don't mind) plz tell me this one also. iam new of this one.

Regards

Shalini Shah

prateek
Active Contributor
0 Kudos

Idocs are available for transfer of master data. So if ur scenario involves simple async scenario, then go for Idoc to Idoc scenario.

Regards,

Prateek

Former Member
0 Kudos

Dear pratik

please tell me the process ,from scratch .

iam new of XI.

Regards

shalini shah

Former Member
0 Kudos

Hi

Since SAP systems are involved, You can go for RFC's BAPI's IDocs or even proxies if your Web As>=6.4

Thanks

former_member214364
Active Contributor
0 Kudos

Hi Shalini,

You have to go for IDOC to IDOC scenario without BPM if you dont have any conditions like bundling of IDOCs.

Please let us know if you need further details.

Cheers,

Jag