Operation Confirmation in Production Order using rework functionality

Sep 08, 2017 at 08:19 PM

322

avatar image

Hi SAP Gurus,

With in the confirmation (CO11n) there is the ability to confirm a rework as seen in the Quantities tab. Currently when doing a confirmation it might be a case where one of the machine parts needs to be reworked. Creating a confirmation is easy but my question is: after a rework is fixed and needs to continue the routing in the operations within the Production Order, how does SAP know that this part is no longer a rework? When I run a report and it shows 1 item in rework, then after it is back in the normal routing, how does the system know that this reworked items is no longer in Rework?

Thank you,

Gary