Hi,

We are parametrizing our internal MRP and due to our manufacturing capacities are limited and our demand has a lot of fluctuation we need to stablish and steady supply demand in the mid term planning ( even during the year we can reach a high stock), we tried with Fixed lot sizes or M1 but it always creates 2 purchase requisition in the same period, when we can only order 1 per month ( and as much similiar sizes as we can), is there any Lot size we can use?